Engineering consultancy · MCR & BMS · Valais

wall-i wall-i — building automation engineering consultancy (MCR & BMS) in Valais: innovation, integration, interoperability.

Every building data point, in the right place.

Independent engineering consultancy in Valais — from control concept to commissioning: SIA-compliant, vendor-neutral installations that are easy to operate.

Business launch
—days —hours —min —sec
↓Scroll to explore

(00)Approach

We guide building owners and architects towards high-performing, durable buildings — with installations that are reliable, compliant and simple to operate.

(01)Engineering

Our craft, end to end

Neutral advice, design, tendering and supervision: a single thread from brief to handover.

[01]Owner's engineering

Assistance to the building owner (BAMO): neutral advice and clear, objective decision structures.

[02]Controls design & tendering

Vendor-neutral control system concepts and tender documents. Clear, detailed drawings and transparent comparison between integrators.

[03]BMS / EMS architecture

BACnet · KNX · Modbus integration. Centralised supervision for simpler, more sustainable operation.

[04]Audit & consulting

Analysis of existing control installations, energy-saving potential and renovation strategy.

[05]Tool development

Custom software and electronic tools that simplify controls engineering and integration.

[06]Integration & commissioning

Controller programming, functional testing, commissioning and operator training.

(02)Innovations

Tools we build ourselves

Where off-the-shelf software stops, we build our own software and electronics — to make engineering more reliable and MCR integration faster.

This technical independence delivers precise, traceable results that are reproducible from one project to the next.

100%
Vendor-independent
SIA
Standards & KBOB
MCR
+ BMS / EMS
VS
Rooted in Valais

(03)Interoperability

One language for every device

We make heating, ventilation, lighting, energy and security talk to each other on a single supervision platform — whatever the brands installed.

BACnet
IP / MS-TP
KNX
Bus / IP
Modbus
RTU / TCP
M-Bus
Metering
MQTT / API
IoT / Cloud

(04)Disciplines

Every technical discipline

[01]HVAC

Heating, ventilation and air conditioning — control and comfort optimisation.

[02]Heat & cooling generation

Boilers, heat pumps, chillers, free cooling and heat recovery, finely controlled.

[03]Distribution

Hydraulic and air networks: balancing, pumps, valves and terminal control.

[04]Lighting

DALI / KNX control, scenes and presence detection.

[05]Energy & metering

Sub-metering, monitoring and performance reporting.

[06]Electrical

Switchboards, power distribution and coordination with the control system.

[07]Blinds & solar shading

Automated solar shading for comfort and savings.

[08]KBOB nomenclature

Rolling out the KBOB nomenclature for our clients: standardised equipment tagging that keeps installations consistent, traceable and easy to operate.

(05)About

A team of independent engineers

Close to the site and to the building owner, we put engineering rigour at the service of lean, durable installations that are easy to operate.

Tobias Bétrisey, co-founder of wall-i
Tobias Bétrisey Co-founder · Engineer HES

“Advice is only worth something when nothing constrains it.”

Jérôme Savioz, co-founder of wall-i
Jérôme Savioz Co-founder · Engineer HES

“Interoperability is not declared, it is verified on site.”

wall-i The engineering assistant

“Every building data point, in the right place.”

(06)FAQ

Frequently asked questions

The questions we hear most. For anything else, wall-i answers live.

[01]What exactly is your role?

To support the building owner so the project runs smoothly and delivers an installation that works and is easy to operate. In practice: specifications, tender documents, bid review, documentation, standards compliance, system analysis and optimisation — with a KBOB nomenclature that unifies the portfolio and central supervision that simplifies daily operation.

[02]New build or renovation?

We work on new builds and renovations alike: analysis of existing installations, optimisation and a phased renovation strategy compatible with ongoing operation.

[03]Do you impose brands?

Our specifications are open to every brand: the client is never locked in and the tender stays open to as many integrators as possible. BACnet, KNX, Modbus and M-Bus all talk on a single supervision platform.

[04]Do you follow SIA and KBOB?

Our deliverables follow SIA standards and we roll out the KBOB nomenclature: standardised tagging that unifies the owner's portfolio and keeps every site readable for its operators.

[05]Which region do you cover?

Mainly across French-speaking Switzerland, from Valais. We are bilingual and also work in German-speaking Switzerland.

[06]How do we get in touch?

Write to hello@wall-i.ch — we'll get back to you shortly.

(07)Contact

A new build, a renovation or an optimisation project?

Write to us hello@wall-i.ch We'll get back to you shortly.
We'll be right here for you.
—days —hours —min —sec

(08)Articles

What we publish

Our posts will start on site: a problem met during construction, a standard widely misread, a tool we had to write ourselves.

See all articles Follow on LinkedIn

(09)Tools

Our tools, online

The naming reference is open to everyone. The EDE file checker stays reserved for our clients and partners. In both cases the processing happens entirely in your browser.

Naming · BACnet Open access

wall-i reference

The wall-i naming system and the BACnet objects: data point address generator, designation blocks, functional ranges of device numbers, pipe colours, required object types and expected properties. The UNIFR and SBAT reference sets are available from the client area. In French, as the directives are.

Open the reference
BACnet · KBOB Restricted access

EDE file checker

Checks an EDE file line by line against our guidelines: KBOB nomenclature, object types, instance numbers, notification classes and state texts. The report flags every deviation and the line it sits on.

More tools will follow, as project needs arise.  ·  No access to the EDE checker yet? Write to us at hello@wall-i.ch